Pipe jacking is a specialized trench-less construction service aimed at installing pipes. This method involves the creation of a tunnel or bore underground, through which the new pipe is pushed or jacked into place.

Service Components

01.

Site Assessment

Site Assessment

A comprehensive evaluation of the project site is conducted to determine feasibility, potential challenges, and appropriate
02.

Design and Planning

Design and Planning

Engineers and designers create a detailed plan for the pipe jacking process, equipment, and safety measures.
03.

Tunnel Excavation

Tunnel Excavation

A tunnel or bore is excavated ahead of the pipe installation using specialized excavation equipment.
04.

Pipe Preparation

Pipe Preparation

The pipe segments are prepared for installation, which may involve welding process.
05.

Pipe Jacking

Pipe Jacking

This method are used to advance thepipesegments through the pre-excavatedtunnel
06.

Grouting

Grouting

Once the pipe is in position, grout or other materials may be injected
07.

Connection & Sealing

Connection & Sealing

Connections are made to existing infrastructure if necessar
08.

Site Restoration

Site Restoration

Any disturbed areas around the installationsitearerestored to their original condition
09.

Quality Control

Quality Control

The process to ensure the integrity of theinstalledpipe and the safety of the surrounding area

Benefits

Faster Construction
Better for the Environment
Reduced Risk of Utility Damage
Longevity and Durability
Minimal Cost – Savings Surface Disruption

Applications