OUR PROJECTS

OUR PROJECTS

roadwork

01.

NKVE Setia Alam, Selangor

Roadwork road widening

Full Completion Period: 2018 to March 2019
Construction of maintenance activities carried out on roads include tasks such as road resurfacing. For those who are planning construction projects or need detailed planning for related activities, businessplan schreiben lassen can provide valuable assistance in creating a structured and effective plan. Grading activities, such as digging, filling, and leveling the ground, are often key elements of such projects.
Canal-widening

02.

Pendang, Kedah

Canal widening

Still In Progress

Construction projects often involve habitat creation, water quality improvement, or other conservation efforts to maintain the ecological balance of the river and prevent downstream impacts. For those managing the complexities of such initiatives, seeking professional support, like bachelorarbeit schreiben lassen, can provide valuable insights and assistance in developing comprehensive project plans.

project-1

03.

Kota Setar, Kedah

Pembinaan Loji Rawatan Kumbahan Serantau Dan Rangkaian Paip Pembetungan

Full Completion Period: January 2020 to June 2023
Construction of 90nos 2.1m to 4.2m caisson pit averaging at 9m to 16m depth, 1400m of 225mm Pipe Jacking using auger boring method, 1400m of 450mm Pipe Jacking using slurry method, 1200m of 600mm Pipe Jacking using slurry method, & full completion of 180nos public sewer manholes
homepage-bg

04.

Bandaraya Melaka - Batu Berendam(Reka dan Bina)

Pembinaan Paip Pembetungan

Full Completion Period: May 2021 to July 2021
Pipe Jacking using slurry method for 1350mmPipe over 300m of length in one stretch
Penang

05.

Ijok, Selangor

Sludge removal from retention pond

Full Completion Period: 2021
Ijok

06.

Penang

Land Reclamation and Removal of Sand Fill Surcharge at Gurney Wharf (Gurney Drive) Pulau Pinang

Full Completion Period: 2020